I am at Arby's from 7am to 2pm tomorrow. I will be at he IMC at 4pm tomorrow.<br><br><br><br><div class="gmail_quote">On Fri, Sep 9, 2011 at 11:11 AM, Chris Ritzo <span dir="ltr"><<a href="mailto:chris.ritzo@gmail.com">chris.ritzo@gmail.com</a>></span> wrote:<br>
<blockquote class="gmail_quote" style="margin: 0pt 0pt 0pt 0.8ex; border-left: 1px solid rgb(204, 204, 204); padding-left: 1ex;">Hey Leon,<br>This summary looks fine to me. Two main priorities to start with. <br><br>Follow up question- have you spoken to Isak/shows about the cables leading to the soundboard and also to anyone from WRFU about the cables going to their room? I don't think they'll care about where the cables are routed, or where we move them to, but I think we should consult with them about where they are connected so we can connect them back up in the right spots.<br>

<br>Perhaps we can meet to sketch out the exact materials, number of power outlets & locations. Are you available tomorrow? If not I can gather this info and get it to you. The box itself will need to have vents in the side and potentially a couple small fans to vent air in & out. I have a couple ideas on this and could work with you to build it. <br>

<br>Let me know if you're free between 10-12 tomorrow, or in the afternoon, or we can meet up next week sometime.<br><font color="#888888"><br>Chris</font><div><div></div><div class="h5"><br><br><div class="gmail_quote">
On Fri, Sep 9, 2011 at 10:55 AM, leon mcgee <span dir="ltr"><<a href="mailto:leonmcgeeamericorps@gmail.com" target="_blank">leonmcgeeamericorps@gmail.com</a>></span> wrote:<br>
<blockquote class="gmail_quote" style="margin: 0pt 0pt 0pt 0.8ex; border-left: 1px solid rgb(204, 204, 204); padding-left: 1ex;">Hey Fellas,<br><br>I think we have talk about this already. If not, I need all the materials needed for this project. The amount of conduit we may need. Will we be building security box for other switches besides the one in the production room? How many power outlets we may need to install. That is all I have, but anything that would be a building cost. My first step too this is to get the Production room and the Finance room complete with the upgrades and the wiring through the ceiling eliminated. Second is to get all the new wireless routers throughout the building out of reach. Focusing on just these two items now should do. Chris as for the fire Hazard issue, we will focus on just getting the Production room fire proof.<br>


<br>Hit me back for any clarity.<br clear="all"><font color="#888888">
<br>-- <br>Building Coordinator<br>Leon McGee<br>202 S Broadway<br>Urbana, IL 61801<br><a href="mailto:Leonmcgeeamericorps@gmail.com" target="_blank">Leonmcgeeamericorps@gmail.com</a><br><br>
</font></blockquote></div><br>
</div></div></blockquote></div><br><br clear="all"><br>-- <br>Building Coordinator<br>Leon McGee<br>202 S Broadway<br>Urbana, IL 61801<br><a href="mailto:Leonmcgeeamericorps@gmail.com" target="_blank">Leonmcgeeamericorps@gmail.com</a><br>
<br>